About Us Commercial Construction Project Management Design Build Residential Development Projects
User Sign In

Contact us at:
Von Ast Construction

268 Main Street
Box 219
Niverville, MANITOBA
R0A 1E0
Phone: (204) 388-4696
Fax: (204) 388-4707

Key staff

Location Map

Information on new building/location

Related Links

Home > Design Build
Design Build

The Design Build process includes in-house design, the development of building plans and working with architects, consultants and sub-contractors as required. It is a process that allows us to be involved in every stage of your project, ensuring client-specific needs are implemented throughout the process. We can be involved in budgeting and estimating as much or as little as you want. 

Our involvement in the design of a structure allows us to streamline the building process, eliminate overlap and improve costs to the customer. 

For a positive building experience, let Von Ast Construction be involved in your project from start to finish.

Frontier Dealership (Hwy 75 & Red River Dr.)

This building was originally constructed as an RV dealership for the Frontier group. It has since been converted and is currently being used by Auction Direct in the sale of pre-owned vehicles.   ...

Morris Bigway

 Morris Bigway Foods was constructed in the image of the Bigway outlet in Niverville MB.  

Niverville Bigway

  Niverville Bigway Foods is a modern full service marketplace that serves Niverville and the surrounding area.

Niverville Primary Health Care Center

The Niverville Primary Health Care Center is located inside of the Niverville Heritage Center. Von Ast Construction was recently contracted to perform substantial modifications to the interior offices of the center.   ...

St. Pierre Bible Fellowship Church

  The St.Pierre Bible Fellowship Church is located at 488 Joubert St. in St. Pierre-Jolys MB. ...